Photo Gallery - CA

 

SCS CA Team

Our Construction Administration staff make our projects come to life. They maintain strict and high standards of excellence on all projects. The team holds monthly in-field-training seminars to review inspection methods, new technologies and safety issues.

TRCA 2009 Erosion and Sediment Control Training

The course provided erosion and sediment control training for practicing Environmental Monitors (ESC site inspectors) based on guidance provided in the Greater Golden Horseshoe Area Conservation Authorities Erosion and Sediment Control Guideline for Urban Construction. All of our SCS field staff participated in the environmental training.

SCS CA Team
Sewer Trenching
   
Outlet head wall for expansion swale
Pouring full stage curb around radius
   
Installation of watermain abutting
existing subdivision
Installation of watermain and services
 
Engineer fill operation being completed
Sanitary drop structure being installed
   
Removal of temporary flushing
hydrant and connection
to existing watermain
Silt fence after installation
   
Engineer fill being completed
Check Dam installation to control runoff
   
Installation of 150mm gate valve and 2" services with in future valve chamber
D8 leveling fill material in order for proper compaction to take place
   
Millard street bridge construction
Base asphalt construction
   
Construction of sanitary lift station wet well
Backfilling sanitary lift station sanitary wet well
   
Stormwater Management Pond in Ballantrae Golf and Country Club
SCS Site Sign
Pond Excavation
 